Subset Overview / Details
______________________________________________________________
Requirement Set: CMMI
Subset: Supplier Agreement
Management (SAM)
______________________________________________________________
Notes:
·
The contents of this web page were extracted from
the following document: Capability Maturity Model® Integration
(CMMISM), Version 1.1, Continuous Representation,
CMU/SEI-2002-TR-011, March 2002 (CMMI-SE/SW/IPPD/SS). Copyright 2002 by
Carnegie Mellon University. NO WARRANTY.
·
Ignore the identifiers
in square brackets that appear at the end of paragraphs.
·
The formatting may not
be the same as in the printed CMMI document. The web page is best viewed in
Internet Explorer.
·
In the CMMI, a subset is known as a "Process
Area (PA)" and a requirement is known as a "Practice". The
specific practices are referred to as SPs and the generic practices are
referred to as GPs.
·
This web page contains the text for SPs and GPs as
it appears in Chapter 7 of the CMMI document, in the section corresponding to
the process area named in the heading of this page. This web page does not
include the detailed description of the GPs that appears in a separate chapter
of the CMMI document; the detailed
description of the GPs is available in a separate web
page. (Note: Using the hyperlink provided here will open that web page in a
separate window.)
______________________________________________________________
Category: Project Management
Purpose
The purpose of Supplier Agreement Management is to manage
the acquisition of products from suppliers for which there exists a formal
agreement. [PA166]
Introductory Notes
The Supplier Agreement Management process area involves
the following: [PA166.N104]
· Determining the type of acquisition that will be used for the products to be acquired
· Selecting suppliers
· Establishing and maintaining agreements with suppliers
· Executing the supplier agreement
· Accepting delivery of acquired products
· Transitioning acquired products to the project
This process area primarily applies to the acquisition of
products and product components that are delivered to the project’s customer.
To minimize risks to the project, this process area may also be applied to the
acquisition of significant products and product components not delivered to the
project’s customer (for example, development tools and test environments). [PA166.N105]
This process area does not directly address arrangements
in which the supplier is integrated into the project team (for example,
integrated product teams). Typically, these situations are handled by other
processes or functions, possibly external to the project, though some of the
specific practices of this process area may be useful in managing the formal
agreement with such a supplier. [PA166.N106]
Suppliers may take many forms depending on business
needs, including in-house vendors (i.e., vendors that are in the same organization
but are external to the project), fabrication capabilities and laboratories,
and commercial vendors. [PA166.N103]
See the definition of “supplier” in Appendix C, the
glossary. [PA166.N107]
A formal agreement is any legal agreement between the organization
(representing the project) and the supplier. This agreement may be a contract,
a license, or a memorandum of agreement. The acquired product is delivered to
the project from the supplier and becomes part of the products delivered to the
customer. [PA166.N101]
See Chapter 3 for an explanation of how “product” is used
in the CMMI Product Suite. [PA166.N108]
Refer to the Integrated Supplier Management process area for more
information about analyzing sources of products and monitoring selected supplier
processes and work products. [PA166.N108.R101]
Refer to the Project Monitoring and Control process area for more
information about monitoring projects and taking corrective action.
[PA166.R101]
Refer to the Requirements Development process area for more information
about defining requirements. [PA166.R102]
Refer to the Requirements Management process area for more information
about managing requirements, including the traceability of requirements for products
acquired from suppliers. [PA166.R103]
Refer to the Technical Solution process area for more information about
determining the products and product components that may be acquired from
suppliers. [PA166.R104]
Specific Goals
SG 1 Establish
Supplier Agreements [PA166.IG101]
Agreements with the suppliers are established and maintained.
SG 2 Satisfy
Supplier Agreements [PA166.IG102]
Agreements with the suppliers are satisfied by both the project and the supplier.
Generic Goals
GG 1 Achieve
Specific Goals [CL102.GL101]
The process supports and enables achievement of the specific goals of the process area by transforming identifiable input work products to produce identifiable output work products.
GG 2 Institutionalize
a Managed Process [CL103.GL101]
The process is institutionalized as a managed process.
GG 3 Institutionalize
a Defined Process [CL104.GL101]
The process is institutionalized as a defined process.
GG 4 Institutionalize
a Quantitatively Managed Process
[CL105.GL101]
The process is institutionalized as a quantitatively managed process.
GG 5 Institutionalize
an Optimizing Process [CL106.GL101]
The process is institutionalized as an optimizing process.
Practice-to-Goal Relationship Table
SG 1 Establish Supplier Agreements
[PA166.IG101]
SP 1.1-1 Determine Acquisition Type
SP 1.2-1 Select Suppliers
SP 1.3-1 Establish Supplier Agreements
SG 2 Satisfy Supplier Agreements
[PA166.IG102]
SP 2.1-1 Review COTS Products
SP 2.2-1 Execute the Supplier Agreement
SP 2.3-1 Accept the Acquired Product
SP 2.4-1 Transition Products
GG 1 Achieve Specific Goals [CL102.GL101]
GP 1.1 Perform Base Practices
GG 2 Institutionalize a Managed Process [CL103.GL101]
GP 2.1 Establish an Organizational Policy
GP 2.2 Plan the Process
GP 2.3 Provide Resources
GP 2.4 Assign Responsibility
GP 2.5 Train People
GP 2.6 Manage Configurations
GP 2.7 Identify and Involve Relevant Stakeholders
GP 2.8 Monitor and Control the Process
GP 2.9 Objectively Evaluate Adherence
GP 2.10 Review Status with Higher Level Management
GG 3 Institutionalize a Defined Process [CL104.GL101]
GP 3.1 Establish a Defined Process
GP 3.2 Collect Improvement Information
GG 4 Institutionalize a Quantitatively Managed Process [CL105.GL101]
GP 4.1 Establish Quantitative Objectives for the Process
GP 4.2 Stabilize Subprocess Performance
GG 5 Institutionalize an Optimizing Process [CL106.GL101]
GP 5.1 Ensure Continuous Process Improvement
GP 5.2 Correct Root Causes of Problems
Specific Practices by Goal
SG 1 Establish Supplier Agreements
Agreements with the suppliers are established and
maintained. [PA166.IG101]
SP 1.1-1 Determine Acquisition Type
Determine
the type of acquisition for each product or product component to be acquired. [PA166.IG101.SP101]
Refer to the Technical Solution process area for more information about
identifying the products and product components to be acquired.
[PA166.IG101.SP101.R101]
There are many different types of acquisition that can be
used to acquire products and product components that will be used by the
project.
[PA166.IG101.SP101.N106]
Examples of
types of acquisition include the following: [PA166.IG101.SP101.N107]
· Purchasing commercial off-the-shelf (COTS) products
· Obtaining products through a contractual agreement
· Obtaining products from an in-house vendor
· Obtaining products from the customer
· Combining some of the above (e.g., contracting for a modification to a COTS product or having another part of the business enterprise co-develop products with an external supplier)
Typical Work Products
1. List of the acquisition types
that will be used for all products and product components to be acquired [PA166.IG101.SP101.W101]
Select
suppliers based on an evaluation of their ability to meet the specified
requirements and established criteria. [PA166.IG101.SP102]
Refer to the Decision Analysis and Resolution process area for more
information about formal evaluation approaches that can be used to select
suppliers. [PA166.IG101.SP102.R101]
Refer to the Requirements Management process area for more information
about specified requirements. [PA166.IG101.SP102.R102]
Refer to the Integrated Supplier Management process area for more
information about analyzing sources of products.
[PA166.IG101.SP102.R103]
Criteria should be established to address factors that
are important to the project.
[PA166.IG101.SP102.N101]
Examples of
factors include the following:
[PA166.IG101.SP102.N103]
· Geographical location of the supplier
· Supplier’s performance records on similar work
· Engineering capabilities
· Staff and facilities available to perform the work
· Prior experience in similar applications
Typical Work Products
1. List of candidate suppliers [PA166.IG101.SP102.W101]
2. Preferred supplier list [PA166.IG101.SP102.W102]
3. Rationale for selection of
suppliers [PA166.IG101.SP102.W103]
4. Advantages and
disadvantages of candidate suppliers [PA166.IG101.SP102.W104]
5. Evaluation criteria [PA166.IG101.SP102.W105]
6. Solicitation materials and
requirements [PA166.IG101.SP102.W106]
Subpractices
1. Establish and document criteria for
evaluating potential suppliers. [PA166.IG101.SP102.SubP101]
2. Identify potential suppliers and distribute
solicitation material and requirements to them.
[PA166.IG101.SP102.SubP102]
3. Evaluate proposals according to evaluation
criteria. [PA166.IG101.SP102.SubP103]
4. Evaluate risks associated with each proposed
supplier. [PA166.IG101.SP102.SubP104]
Refer
to the Risk Management process area for more information about evaluating
project risks. [PA166.IG101.SP102.SubP104.R101]
5. Evaluate proposed suppliers' ability to
perform the work. [PA166.IG101.SP102.SubP105]
Examples
of methods to evaluate the proposed supplier’s ability to perform the work
include the following: [PA166.IG101.SP102.SubP105.N101]
· Evaluation of prior experience in similar applications
· Evaluation of prior performance on similar work
· Evaluation of management capabilities
· Capability evaluations
· Evaluation of staff available to perform the work
· Evaluation of available facilities and resources
· Evaluation of the project’s ability to work with the proposed supplier
6. Select the supplier.
[PA166.IG101.SP102.SubP106]
SP 1.3-1 Establish Supplier Agreements
Establish
and maintain formal agreements with the supplier.
[PA166.IG101.SP103]
For Integrated Product and Process Development
When integrated teams are formed, team membership should be negotiated with suppliers and incorporated into the agreement. The agreement should identify any integrated decision making, reporting requirements (business and technical), and trade studies requiring supplier involvement. The supplier efforts should be orchestrated to support the IPPD efforts undertaken by the acquirer. [PA166.IG101.SP103.AMP101]
A formal agreement is any legal agreement between the organization
(representing the project) and the supplier. This agreement may be a contract,
a license, or a memorandum of agreement.
[PA166.IG101.SP103.N101]
Typical Work Products
1. Statements of work [PA166.IG101.SP103.W101]
2. Contracts [PA166.IG101.SP103.W102]
3. Memoranda of agreement [PA166.IG101.SP103.W103]
4. Licensing agreement [PA166.IG101.SP103.W104]
Subpractices
1. Revise the requirements to be fulfilled by
the supplier to reflect negotiations with the supplier when necessary. [PA166.IG101.SP103.SubP101]
Refer
to the Requirements Development process area for more information about
revising requirements. [PA166.IG101.SP103.SubP101.R101]
Refer
to the Requirements Management process area for more information about managing
changes to requirements. [PA166.IG101.SP103.SubP101.R102]
2. Document what the project will provide to
the supplier. [PA166.IG101.SP103.SubP102]
Include the following: [PA166.IG101.SP103.SubP102.N101]
· Project-furnished facilities
· Documentation
· Services
3. Document the supplier agreement. [PA166.IG101.SP103.SubP103]
The supplier agreement should
include a statement of work, a specification, terms and conditions, a list of
deliverables, a schedule, a budget, and a defined acceptance process. [PA166.IG101.SP103.SubP103.N101]
This subpractice typically
includes the following:
[PA166.IG101.SP103.SubP103.N102]
· Establishing the statement of work, specification, terms and conditions, list of deliverables, schedule, budget, and acceptance process
· Identifying who from the project and supplier are responsible and authorized to make changes to the supplier agreement
· Identifying how requirements changes and changes to the supplier agreement are determined, communicated, and addressed
· Identifying standards and procedures that will be followed
· Identifying critical dependencies between the project and the supplier
· Identifying the type and depth of project oversight of the supplier, procedures, and evaluation criteria to be used in monitoring supplier performance
· Identifying the types of reviews that will be conducted with the supplier
· Identifying the supplier’s responsibilities for ongoing maintenance and support of the acquired products
· Identifying warranty, ownership, and usage rights for the acquired products
· Identifying acceptance criteria
Refer
to the Integrated Supplier Management process area for more information about
monitoring selected supplier processes and work products. [PA166.IG101.SP103.SubP103.N102.R101]
4. Ensure all parties to the agreement
understand and agree to all requirements before implementing the agreement. [PA166.IG101.SP103.SubP104]
5. Revise the supplier agreement as necessary. [PA166.IG101.SP103.SubP105]
6. Revise the project’s plans and commitments
as necessary to reflect the supplier agreement.
[PA166.IG101.SP103.SubP106]
Refer
to the Project Monitoring and Control process area for more information about
revising the project plan. [PA166.IG101.SP103.SubP106.R101]
SG 2 Satisfy Supplier Agreements
Agreements with the suppliers are satisfied by
both the project and the supplier.
[PA166.IG102]
Refer to the Monitor Selected Supplier Processes specific practice in the
Integrated Supplier Management process area. Monitoring a supplier’s work
products and processes helps the project achieve the Satisfy Supplier
Agreements goal in this process area.
[PA166.IG102.R101]
Review
candidate COTS products to ensure they satisfy the specified requirements that are
covered under a supplier agreement.
[PA166.IG102.SP101]
In the event that COTS products are desired, care in
evaluating and selecting these products and the vendor may be critical to the
project.
[PA166.IG102.SP101.N101]
For Supplier Sourcing
Integral to the selection decision are proprietary issues and the availability of the products. [PA166.IG102.SP101.N101.AMP101]
Typical Work Products
1. Trade studies [PA166.IG102.SP101.W101]
2. Price lists [PA166.IG102.SP101.W102]
3. Evaluation criteria [PA166.IG102.SP101.W103]
4. Supplier performance
reports [PA166.IG102.SP101.W104]
5. Reviews of COTS products [PA166.IG102.SP101.W105]
Subpractices
1. Develop criteria for evaluating COTS
products. [PA166.IG102.SP101.SubP101]
2. Evaluate candidate COTS products against the
associated requirements and criteria. [PA166.IG102.SP101.SubP102]
Refer
to the Requirements Development process area for more information about the
requirements that will be used to evaluate candidate products. [PA166.IG102.SP101.SubP102.R101]
These requirements address the
following:
[PA166.IG102.SP101.SubP102.N101]
· Functionality, performance, quality, and reliability
· Terms and conditions of warranties for the products
· Risk
· Suppliers' responsibilities for ongoing maintenance and support of the products
3. Evaluate the impact of candidate COTS
products on the project's plans and commitments.
[PA166.IG102.SP101.SubP103]
Evaluate according to the
following:
[PA166.IG102.SP101.SubP103.N101]
· Cost of the COTS products
· Cost and effort to incorporate the COTS products into the project
· Security requirements
· Benefits and impacts that may result from future product releases
Future product releases may
provide additional features that support planned or anticipated enhancements
for the project, but may also result in the supplier withdrawing support of the
version for the product that is acquired by the project. [PA166.IG102.SP101.SubP103.N102]
4. Assess the suppliers' performance and
ability to deliver. [PA166.IG102.SP101.SubP104]
Refer
to the Integrated Supplier Management process area for more information about
analyzing sources of products and monitoring selected supplier processes. [PA166.IG102.SP101.SubP104.R101]
5. Identify risks associated with the selected COTS
product and the supplier agreement. [PA166.IG102.SP101.SubP105]
Refer
to the Project Planning process area for more information about identifying
project risks. [PA166.IG102.SP101.SubP105.R102]
Refer
to the Risk Management process area for more information about identifying
project risks. [PA166.IG102.SP101.SubP105.R101]
6. Select the COTS product to be acquired. [PA166.IG102.SP101.SubP106]
In some cases, selection of COTS
products may require a supplier agreement in addition to the agreements in the
product’s license.
[PA166.IG102.SP101.SubP106.N101]
Examples
of agreements with COTS suppliers include the following:
[PA166.IG102.SP101.SubP106.N102]
· Discounts for large quantity purchases
· Coverage of relevant stakeholders under the licensing agreement, including project suppliers, team members, and the project’s customer
· Plans for future enhancements
· On-site support, such as responses to queries and problem reports
· Additional capabilities that are not in the product
· Maintenance support, including support after the product is withdrawn from general availability
7. Plan for the maintenance of the COTS
product. [PA166.IG102.SP101.SubP107]
SP 2.2-1 Execute the Supplier Agreement
Perform
activities with the supplier as specified in the supplier agreement. [PA166.IG102.SP102]
Refer to the Project Monitoring and Control process area for more
information about monitoring projects and taking corrective action.
[PA166.IG102.SP102.R101]
Typical Work Products
1. Supplier progress reports
and performance measures [PA166.IG102.SP102.W101]
2. Supplier review materials
and reports [PA166.IG102.SP102.W103]
3. Action items tracked to
closure [PA166.IG102.SP102.W104]
4. Documentation of product
and document deliveries [PA166.IG102.SP102.W105]
Subpractices
1. Monitor supplier progress and performance
(schedule, effort, cost, and technical performance) as defined in the supplier
agreement. [PA166.IG102.SP102.SubP101]
2. Monitor selected supplier processes and take
corrective action when necessary. [PA166.IG102.SP102.SubP102]
Examples
of processes to be monitored are quality assurance and configuration
management. [PA166.IG102.SP102.SubP102.N101]
Refer
to the Integrated Supplier Management process area for more information about
monitoring selected supplier processes.
[PA166.IG102.SP102.SubP102.N101.R101]
3. Conduct reviews with the supplier as
specified in the supplier agreement. [PA166.IG102.SP102.SubP103]
Refer
to the Project Monitoring and Control process area for more information about
conducting reviews. [PA166.IG102.SP102.SubP103.R101]
Reviews cover both formal and
informal reviews and include the following steps: [PA166.IG102.SP102.SubP103.N101]
· Preparing for the review
· Ensuring that relevant stakeholders participate
· Conducting the review
· Identifying, documenting, and tracking all action items to closure
· Preparing and distributing to the relevant stakeholders a summary report of the review
4. Conduct technical reviews with the supplier
as defined in the supplier agreement. [PA166.IG102.SP102.SubP104]
Technical reviews typically
include the following:
[PA166.IG102.SP102.SubP104.N101]
· Providing the supplier with visibility into the needs and desires of the project’s customers and end users, as appropriate
· Reviewing the supplier's technical activities and verifying that the supplier’s interpretation and implementation of the requirements are consistent with the project’s interpretation
· Ensuring that technical commitments are being met and that technical issues are communicated and resolved in a timely manner
· Obtaining technical information about the supplier’s products
· Providing appropriate technical information and support to the supplier
5. Conduct management reviews with the supplier
as defined in the supplier agreement. [PA166.IG102.SP102.SubP105]
Management reviews typically
include the following:
[PA166.IG102.SP102.SubP105.N101]
· Reviewing critical dependencies
· Reviewing project risks involving the supplier
· Reviewing schedule and budget
Technical and management reviews
may be coordinated and held jointly. [PA166.IG102.SP102.SubP105.N102]
6. Use the results of reviews to improve the
supplier's performance and to establish and nurture long-term relationships with
preferred suppliers. [PA166.IG102.SP102.SubP106]
7. Monitor risks involving the supplier and
take corrective action as necessary. [PA166.IG102.SP102.SubP107]
Refer
to the Project Monitoring and Control process area for more information about
monitoring project risks. [PA166.IG102.SP102.SubP107.R101]
8. Revise the supplier agreement and project
plans and schedules as necessary. [PA166.IG102.SP102.SubP108]
SP 2.3-1 Accept the Acquired Product
Ensure
that the supplier agreement is satisfied before accepting the acquired product. [PA166.IG102.SP103]
Acceptance reviews and tests and configuration audits
should be completed before accepting the product as defined in the supplier
agreement.
[PA166.IG102.SP103.N101]
Typical Work Products
1. Acceptance test procedures [PA166.IG102.SP103.W101]
2. Acceptance test results [PA166.IG102.SP103.W102]
3. Discrepancy reports or
corrective action plans [PA166.IG102.SP103.W103]
Subpractices
1. Define the acceptance procedures. [PA166.IG102.SP103.SubP101]
2. Review and obtain agreement with relevant
stakeholders on the acceptance procedures before the acceptance review or test. [PA166.IG102.SP103.SubP102]
3. Verify that the acquired products satisfy
their requirements. [PA166.IG102.SP103.SubP103]
Refer
to the Verification process area for more information about verifying products. [PA166.IG102.SP103.SubP103.R101]
4. Confirm that the nontechnical commitments
associated with the acquired work product are satisfied.
[PA166.IG102.SP103.SubP104]
This may include confirming that
the appropriate license, warranty, ownership, usage, and support or maintenance
agreements are in place and that all supporting materials are received. [PA166.IG102.SP103.SubP104.N101]
5. Document the results of the acceptance review
or test. [PA166.IG102.SP103.SubP105]
6. Establish and obtain supplier agreement on
an action plan for any acquired work products that do not pass their acceptance
review or test. [PA166.IG102.SP103.SubP106]
7. Identify, document, and track action items
to closure. [PA166.IG102.SP103.SubP107]
Refer
to the Project Monitoring and Control process area for more information about
tracking action items. [PA166.IG102.SP103.SubP107.R101]
Transition
the acquired products from the supplier to the project. [PA166.IG102.SP104]
Before the acquired product is transferred to the project
for integration, appropriate planning and evaluation should occur to ensure a
smooth transition.
[PA166.IG102.SP104.N101]
Refer to the Product Integration process area for more information about
integrating the acquired products.
[PA166.IG102.SP104.N101.R101]
Typical Work Products
1. Transition plans [PA166.IG102.SP104.W101]
2. Training reports [PA166.IG102.SP104.W102]
3. Support and maintenance
reports [PA166.IG102.SP104.W103]
Subpractices
1. Ensure that there are appropriate facilities
to receive, store, use, and maintain the acquired products. [PA166.IG102.SP104.SubP101]
2. Ensure that appropriate training is provided
for those involved in receiving, storing, using, and maintaining the acquired
products. [PA166.IG102.SP104.SubP102]
3. Ensure that storing, distributing, and using
the acquired products are performed according to the terms and conditions
specified in the supplier agreement or license.
[PA166.IG102.SP104.SubP103]
Generic Practices by Goal
(Note: The detailed description of the GPs is available in a separate web page. Using the hyperlink provided here will open that web page in a separate window. However, the GP elaborations pertinent to the process area of this web page are available below.)
GG 1 Achieve Specific Goals
The process supports and enables achievement of the specific goals of the process area by transforming identifiable input work products to produce identifiable output work products.
Perform
the base practices of the supplier agreement management process to develop work
products and provide services to achieve the specific goals of the process
area. [GP102]
GG 2 Institutionalize a Managed Process
The process is institutionalized as a managed process.
GP 2.1 Establish an Organizational Policy
Establish
and maintain an organizational policy for planning and performing the supplier
agreement management process. [GP103]
Elaboration:
This policy establishes organizational expectations for
establishing, maintaining, and satisfying supplier agreements. [PA166.EL101]
Establish
and maintain the plan for performing the supplier agreement management process. [GP104]
Elaboration:
Typically, portions of this plan for performing the
supplier agreement management process are a part of the project plan as
described in the Project Planning process area. Often, however, some portions
of the plan reside outside of the project with an independent group, such as
contract management. [PA166.EL110]
Provide
adequate resources for performing the supplier agreement management process,
developing the work products, and providing the services of the process. [GP105]
Elaboration:
Examples of
resources provided include the following tools: [PA166.EL102]
· Preferred supplier lists
· Requirements tracking programs
· Project management and scheduling programs
Assign
responsibility and authority for performing the process, developing the work
products, and providing the services of the supplier agreement management
process. [GP106]
Train
the people performing or supporting the supplier agreement management process
as needed. [GP107]
Elaboration:
Examples of
training topics include the following: [PA166.EL103]
· Regulations and business practices related to negotiating and working with suppliers
· Acquisition planning and preparation
· COTS products acquisition
· Supplier evaluation and selection
· Negotiation and conflict resolution
· Supplier management
· Testing and transitioning of acquired products
· Receiving, storing, using, and maintaining acquired products
Place
designated work products of the supplier agreement management process under
appropriate levels of configuration management.
[GP109]
Elaboration:
Examples of work
products placed under configuration management include the following: [PA166.EL104]
· Statements of work
· Supplier agreements
· Memoranda of agreement
· Subcontracts
· Preferred supplier lists
GP 2.7 Identify and Involve Relevant Stakeholders
Identify
and involve the relevant stakeholders of the supplier agreement management
process as planned. [GP124]
Elaboration:
Examples of
activities for stakeholder involvement include the following: [PA166.EL109]
· Establishing criteria for evaluation of potential suppliers
· Reviewing potential suppliers
· Establishing supplier agreements
· Resolving issues with suppliers
· Reviewing supplier performance
GP 2.8 Monitor and Control the Process
Monitor
and control the supplier agreement management process against the plan for performing
the process and take appropriate corrective action.
[GP110]
Elaboration:
Examples of
measures used in monitoring and controlling include the following: [PA166.EL105]
· Number of changes made to the requirements for the supplier
· Cost and schedule variance per supplier agreement
GP 2.9 Objectively Evaluate Adherence
Objectively
evaluate adherence of the supplier agreement management process against its
process description, standards, and procedures, and address noncompliance. [GP113]
Elaboration:
Examples of
activities reviewed include the following: [PA166.EL106]
· Establishing and maintaining supplier agreements
· Satisfying supplier agreements
Examples of
work products reviewed include the following: [PA166.EL108]
· Plan for Supplier Agreement Management
· Supplier agreements
GP 2.10 Review Status with Higher Level Management
Review
the activities, status, and results of the supplier agreement management
process with higher level management and resolve issues. [GP112]
GG 3 Institutionalize a Defined Process
The process is institutionalized as a defined process.
GP 3.1 Establish a Defined Process
Establish
and maintain the description of a defined supplier agreement management
process. [GP114]
GP 3.2 Collect Improvement Information
Collect
work products, measures, measurement results, and improvement information
derived from planning and performing the supplier agreement management process
to support the future use and improvement of the organization’s processes and
process assets. [GP117]
GG 4 Institutionalize a Quantitatively Managed Process
The process is institutionalized as a quantitatively managed process.
GP 4.1 Establish Quantitative Objectives for the Process
Establish
and maintain quantitative objectives for the supplier agreement management
process that address quality and process performance based on customer needs
and business objectives. [GP118]
GP 4.2 Stabilize Subprocess Performance
Stabilize
the performance of one or more subprocesses to determine the ability of the
supplier agreement management process to achieve the established quantitative
quality and process-performance objectives.
[GP119]
GG 5 Institutionalize an Optimizing Process
The process is institutionalized as an optimizing process.
GP 5.1 Ensure Continuous Process Improvement
Ensure
continuous improvement of the supplier agreement management process in
fulfilling the relevant business objectives of the organization. [GP125]
GP 5.2 Correct Root Causes of Problems
Identify
and correct the root causes of defects and other problems in the supplier
agreement management process. [GP121]